Deliverables

Deliverable (number) Deliverable name Work package number Short name of lead participant Type [1] Dissemination level [2] Delivery date (project month)

 

D1.1 Application Requirements 1 MM R PU [3] 6
D1.2 Parallel Applications 1 AB DEM CI 18
D1.3 Integrated Applications 1 AB DEM CI 30
D1.4 Validation Reports 1 PIT R PU 36
D2.1 Specification of Hardware
Platform
2 MM R PU 6
D2.2 Detailed Characterization
of Platforms
2 ETH R PU 18
D2.3 Final Board 2 MM DEM PU 36
D3.1 Programming Model(s)
analysis and selection
3 ETH R PU 6
D3.2.1 Preliminary support for
predictability in the accelerator programing environment
3 ETH DEM CO 18
D3.2.2 Optimized support for
predictability in the accelerator programing environment
3 ETH DEM, R PU 24
D3.3.1 Preliminary runtime for
parallel heterogeneous platforms
3 ETH DEM CO 18
D3.3.2 Optimized runtime for
parallel heterogeneous platforms
3 ETH DEM, R PU 24
D4.1.1 Real-time Linux – preliminary 4 EVI DEM, R CO 18
D4.1.2 Real-time Linux – final 4 EVI DEM, R PU 24
D4.2.1 Lightweight RTOS –
preliminary
4 EVI DEM, R CO 18
D4.2.2 Lightweight RTOS – final 4 EVI DEM, R PU 24
D4.3 Multi-OS integration and
Virtualization
4 EVI DEM, R PU 30
D5.1 Power-Aware Scheduling
Algorithm for Host
5 CTU R PU 24
D5.2 Memory-Aware Scheduling
Algorithm for Accelerators
5 CTU R PU 24
D5.3 Integrated Schedulability
Analysis
5 UNIMORE R PU 30
D6.1.1 Preliminary exploitation
plan
6 PIT R CO 12
D6.1.2 Final exploitation plan 6 PIT R PU 36
D6.2.1 Open source strategy plan 6 PIT R PU 12
D6.2.2 Open source results 6 EVI R PU 36
D7.1 Project management plan 7 UNIMORE R PU 3
D7.1.2 Year 1 Periodic report 7 UNIMORE R PU 12
D7.1.3 Year 2 Periodic report 7 UNIMORE R PU 24
D7.1.4 Final Periodic report 7 UNIMORE R PU 36
D7.1.5 Project Management and
Collaboration Tools
7 UNIMORE DEM, R PU 3
D7.3.1 Dissemination plan 7 PIT R CO 6
D7.3.2 Preliminary dissemination
report
7 PIT R CO 18
D7.3.3 Final dissemination report 7 PIT R PU 36

Notes:

[1] R –> Document, report (excluding the periodic and final reports); DEM –> Demonstrator, pilot, prototype, plan designs; DEC –>Websites, patents filing, press & media actions, videos, etc; OTHER –> Software, technical diagram, etc.
[2] PU –>Public, fully open, e.g. web ; CO –>Confidential, restricted under conditions set out in Model Grant Agreement; CI –> Classified.
[3] Depending on the classification level of the single application, some parts of the deliverable could be classified or omitted.